patch https://www.ruddr.io/api/workspace/project-other-items/
Updating a project other item is only available if the item has not already been invoiced.
If either
quantity
orrate
are set to a value, then both are required andfee
will be calculated. Otherwise, those fields can be set tonull
(the default) andfee
can be set directly.